Skip to end of metadata
Go to start of metadata
  • Updates:
    • Junwon
      • Ironing out CAD
      • Filling out BOM
      • Monday → CAD, FEA → Thursday
    • Rachel
      • Mounting the accumulator
        • Green light from testing
      • Mounting logistics
        • Interior
        • Exterior
    • Kevin
      • Composites layup testing
      • Seat CAD
      • Sizing wings, mounting wings
        • structural analysis before thursday
    • Nathan
      • Shipping chassis tomorrow 
      • Knuckles need analysis
      • Starting fab
        • control arms
        • bearing cups
        • tabs
    • Naomi
      • Pedal geometry done
      • Cleaning out the MC
    • Alex
      • found epoxy
      • Testing in the second semester?
        • Sara and Min to carry on
        • Most testing to be done first semester
  • CAD practices
    • Recommended Hardware
    • hiding sketches
    • lightweight assemblies
    • etc
  • Winter Break plans
    • Parts drawings
    • BOM making
    • Ordering parts
    • Getting everything ready to fab as soon as we get back
  • Plan between now and the end of semester
    • CAD
    • analysis
  • No labels